
Add to Cart
Full Automaitc High Efficiency 1 - 10t Horziontal Coal Steam Boiler
Product Name |
Coal Steam Boiler
|
Fuel Type |
Coal
|
Thermal Efficiency |
80%
|
Operation Control |
Automatic
|
Structure |
Fire Tubes
|
After-sales Service Provided |
Engineers Available To Service Machinery Overseas
|
Quality Assurance
1. Strength calculation test report of applied materials
2. Whole set of pure water processor line featured with RO anti-saturation and advanced testing devices
3. Hydraulic test report: ensure the standard working pressure and safety
4. Third-party inspection report-Jiaozuo Special Equipment Inspection & Technical Research
Steam Boiler Model
Item/Unit/Model |
DZL1- 0.7(1.25) |
DZL2-0.7(1.25) |
DZL4- 1.25 |
DZL6- 1.25 |
DZL8- 1.25 |
DZL10-1.25 | ||
Rated steam capacity | t/h | 1 | 2 | 4 | 6 | 8 | 10 | |
Rated working pressure | Mpa | 0.7(1.25) | 0.7(1.25) | 1.25 | 1.25 | 1.25 | 1.25 | |
Rated steam temperature | ℃ | 171(194) | 171(194) | 194 | 194 | 194 | 194 | |
Rated feedwater temperature | ℃ | 20 | 20 | 20 | 20 | 20 | 20 | |
Heating surface | ㎡ | 39.5 | 76.12 | 135.98 | 226.72 | 396.26 | 412.3 | |
Grate area | ㎡ | 2.65 | 3.74 | 4.3 | 7.22 | 10.3 | 11.8 | |
Fuel type | kg | Coal | Coal | Coal | Coal | Coal | Coal | |
Thermal efficiency | % | 77.16 | 77 | 78 | 81 | 81 | 79.6 | |
Fuel consumption | kg/h | 155 | 311 | 615 | 888 | 1185 | 1507 | |
Emission concentration | mg/Nm³ | <80 | <80 | <80 | <80 | <80 | <80 | |
External Dimension | L | m | 4.12 | 5.6 | 6.78 | 6.92 | 7.56 | 9.5 |
W | m | 1.92 | 2.6 | 2.73 | 2.83 | 3.28 | 3.35 | |
H | m | 3.25 | 3.32 | 3.25 | 3.72 | 4.25 | 4.9 | |
Boiler Weight | t | 11.5 | 22.73 | 27.26 | 38.13 | 54.26 | 57.63 | |
Main steam valve | mm | 50 | 80 | 100 | 150 | 150 | 150 | |
Feedwater valve | mm | 32 | 40 | 40 | 40 | 40 | 50 | |
Safety valve | mm | 2×40 | 2×50 | 2×50 | 2×80 | 2×80 | 2×80 | |
Drain valve | mm | 40 | 40,50 | 40,50 | 40,50 | 40,50 | 40,50 | |
Level gauge | mm | 25 | 25 | 25 | 25 | 25 | 25 |
Our Service
Consultation service: Experienced technicians guidance is available on the phone, and on the internet.
Installation service: One or more engineers will be dispatched to the installation site to help install the customers’ boilers.
Training service: We also provide necessary training about boiler operation and daily maintenance to local workers.
Warm service: Based on customers’ request and budget, our experts make efficient, reliable solutions, and we produce strictly following customers’ order. Every customer has the chance to visit our workshops before placing the order.
Product Show